Project

General

Profile

Bug #4892

Google MAP Optimization IOS Rider.

Added by Shalu T S 10 months ago.

Status:
New
Priority:
High
Assignee:
Jeevan C Paul
Target version:
Start date:
Due date:
% Done:

0%

Estimated time:
Milestone:
Sprint 29 Tukxi Ride 2025 Apr 02 to June 27
Branch name:

Description

1. Dropoff route (line) is showing in the MAP. As per the requirement, there is no need to show the trip route, when the trip is in the en route status.

No data to display

Also available in: Atom PDF