Project

General

Profile

Bug #2985

Subtotal amount showing on the trip request page and the fare breakdown page are not the same.

Added by Shalu T S almost 2 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Normal
Assignee:
Anjali M
Target version:
Start date:
06/13/2024
Due date:
06/26/2024
% Done:

0%

Estimated time:
24.00 h
Milestone:
Sprint 20 Tukxi Ride 2024 June 01 to June 30
Branch name:
sprint-19_anjali_2985

Description

Subtotal amount showing on the trip request page and the fare breakdown page are not the same.

STR.
1. Search a location and apply the coupon.
2. Check the amount in the trip page.
3. Take fare breakdown.
4. Check the amount in breakdown.

ER.
4. The amount should be same in both the pages.

AR.
4. Subtotal amount showing on the trip request page and the fare breakdown page are not the same.


Files

IMG_0088[1].PNG (526 KB) IMG_0088[1].PNG Shalu T S, 06/13/2024 07:28 AM
IMG_0089[1].PNG (433 KB) IMG_0089[1].PNG Shalu T S, 06/13/2024 07:28 AM
IMG_0090[1].PNG (112 KB) IMG_0090[1].PNG Shalu T S, 06/13/2024 07:28 AM
#2

Updated by Shalu T S almost 2 years ago

  • Assignee changed from Anupama P to Anjali M
#3

Updated by Anjali M almost 2 years ago

  • Status changed from New to In Progress
  • Estimated time set to 24.00 h
#4

Updated by Anupama P almost 2 years ago

  • Branch name set to sprint-19_anjali_2985
#5

Updated by Anupama P almost 2 years ago

  • Due date set to 06/20/2024
#6

Updated by Jithin Kuriakose almost 2 years ago

  • Due date changed from 06/20/2024 to 06/26/2024
#7

Updated by Anjali M almost 2 years ago

  • Status changed from In Progress to Resolved
#8

Updated by Jeevan C Paul over 1 year ago

  • Status changed from Resolved to QA Ready
#9

Updated by Shalu T S over 1 year ago

  • Status changed from QA Ready to QA Passed

Issue fixed.

#11

Updated by Shalu T S over 1 year ago

  • Status changed from QA Passed to Closed

Verified in production.

Also available in: Atom PDF